
POST-IKEA SPECIALIST · BUCHAREST & ILFOV
Kitchen appliance installation, after your cabinets are in.
We connect and align the appliances the furniture team leaves unfinished — cooktop, oven, hood, dishwasher, and sink. Electrical done to safety standards, everything tested, warranty paperwork in your hands.
From 600 lei ● Free quote from photos ● English-speaking team
WHERE WE FIT
We don't assemble cabinets. We make them functional.
IKEA delivery teams and flat-pack installers put the carcasses on the wall — then they stop. What's left is the part that needs an electrician and a careful hand: connecting the appliances safely and aligning everything so the kitchen looks built-in, not bolted-on. That's our job.
The technical finish, after the cabinets are up
-
Connect electric & induction cooktops to a dedicated, tested circuit
-
Install and power built-in ovens, combi-microwaves, warming drawers
-
Mount and duct extractor hoods — recirculating or ducted
-
Plumb and power dishwashers — inlet, drain, electrical, test cycle
-
Fit sinks & mixer taps — seal, waste, trap, no drips
-
Align doors, panels, and plinths so the fronts sit flush
So you know exactly who does what
-
Cabinet carcass assembly — the flat-pack / IKEA team, before we arrive
-
Gas cooktop connection — done by an authorized gas fitter we coordinate
-
Worktop cutting & templating — your stone or laminate supplier
-
Supplying the appliances — you or your designer buy them; we connect them
WHAT'S INCLUDED
Every connection, done properly and tested
01
Lighting Design Execution
Electric and induction hobs wired to a dedicated circuit, tested, and leveled into the worktop cut-out.
02
Built-in oven installation
Ovens, combi-microwaves, and warming drawers slotted, secured, powered, and function-checked.
03
Extractor hood
Ducted or recirculating hoods mounted, connected, and aligned with the cabinetry line.
04
Dishwasher
Water inlet, drain into the trap, electrical connection, leak check, and a full test cycle before we leave.
05
Sink & tap
Inset or undermount sinks sealed, mixer taps fitted, waste and trap connected — no drips.
06
Final alignment & handover
Fronts leveled, plinths cut to fit, surfaces cleaned, packaging removed, warranty paperwork handed over.