html
top of page

POST-IKEA SPECIALIST · BUCHAREST & ILFOV

Kitchen appliance installation, after your cabinets are in.

We connect and align the appliances the furniture team leaves unfinished — cooktop, oven, hood, dishwasher, and sink. Electrical done to safety standards, everything tested, warranty paperwork in your hands.

From 600 lei Free quote from photos English-speaking team

WHERE WE FIT

We don't assemble cabinets. We make them functional.

IKEA delivery teams and flat-pack installers put the carcasses on the wall — then they stop. What's left is the part that needs an electrician and a careful hand: connecting the appliances safely and aligning everything so the kitchen looks built-in, not bolted-on. That's our job.
The technical finish, after the cabinets are up
  • Connect electric & induction cooktops to a dedicated, tested circuit

  • Install and power built-in ovens, combi-microwaves, warming drawers

  • Mount and duct extractor hoods — recirculating or ducted

  • Plumb and power dishwashers — inlet, drain, electrical, test cycle

  • Fit sinks & mixer taps — seal, waste, trap, no drips

  • Align doors, panels, and plinths so the fronts sit flush

So you know exactly who does what
  • Cabinet carcass assembly — the flat-pack / IKEA team, before we arrive

  • Gas cooktop connection — done by an authorized gas fitter we coordinate

  • Worktop cutting & templating — your stone or laminate supplier

  • Supplying the appliances — you or your designer buy them; we connect them

WHAT'S INCLUDED

Every connection, done properly and tested

01

Lighting Design Execution

Electric and induction hobs wired to a dedicated circuit, tested, and leveled into the worktop cut-out.

02

Built-in oven installation

Ovens, combi-microwaves, and warming drawers slotted, secured, powered, and function-checked.

03

Extractor hood

Ducted or recirculating hoods mounted, connected, and aligned with the cabinetry line.

04

Dishwasher

Water inlet, drain into the trap, electrical connection, leak check, and a full test cycle before we leave.

05

Sink & tap

Inset or undermount sinks sealed, mixer taps fitted, waste and trap connected — no drips.

06

Final alignment & handover

Fronts leveled, plinths cut to fit, surfaces cleaned, packaging removed, warranty paperwork handed over.

bottom of page